XX职业学院学生宿舍H栋投标文件.rar

资料分类:土木工程 上传会员:雨橙 更新时间:2014-01-06
需要金币1000 个金币 资料包括:完整论文 下载论文
转换比率:金额 X 10=金币数量, 例100元=1000金币 论文字数:7652
折扣与优惠:团购最低可5折优惠 - 了解详情 论文格式:Word格式(*.doc)

摘要:此项目为XX学院学生宿舍H栋,项目所在地为重庆市沙坪坝区虎溪大学城。本工程结构类型为框架结构,属于一类高层建筑,工程类别为一类。该投标文件的编制是以XX学院学生宿舍H栋的施工合同以及施工设计图纸为依据,以及国家和地方现行的一系列施工和技术规范、标准等,该施工组织针对本工程的地方性及环境特点、工期要求,提出合理可行的保证措施加以重点阐述。

   该项目的建设单位为XX学院。由于荷载比较大,基础结构采用人工挖孔桩基础和独立基础。此外对耐火、抗震和防雷要求都比较高,耐火等级为一级,抗震设防烈度为六度,防雷等级标准为二类,屋面防水等级为二级。坚持科学的基本建设程序和施工顺序,运用网络技术分段、分层流水作业,合理安排施工顺序和施工计划,确保施工进度,本工程拟定工期为210个日历天。

   我方承诺,我方一旦中标,一定将全面调度公司的人、财、物,积极推广应用新技术、新工艺、新材料、新设备,严格按照ISO9002质量体系运行。贯彻施工技术规范、操作规程,实施全面质量管理。精心组织、科学管理,确保实现各项承诺目标。保证在规定的工期内。

关键词:措施 项目 技术 承诺

 

ABSTRACT:The project for the Chongqing City Administration of Career Academy students' dormitory building H, the project is located in Shapingba District of Chongqing City Huxi university. This engineering structure types of frame structure, belongs to a class of high-rise buildings, engineering class as a class.. The preparation of the bidding documents to Chongqing city management Career Academy students' dormitory construction contract H building and construction design drawings as the basis, and the national and local existing a series of construction and technical specifications, standards, the construction organization for local and environmental characteristics, this project construction, puts forward measures to ensure the reasonable and feasible to focus on.

   The project construction units for the Chongqing City Administration of Career Academy. As the load is relatively large, basic structure using artificial hole digging pile foundation and independent foundation.. In addition, are high on fire, earthquake and lightning protection requirements, fire-resistant grade level, seismic fortification intensity is six degrees, the lightning protection level standards for two categories, roofing waterproofing rank for grade two.. Adhere to the basic construction procedures and the construction sequence of science, using the technology of network segment, stratified flow, the reasonable arrangement of construction schedule and construction plan, ensure that the construction schedule, the project construction period for the development of 210 calendar days.

   Ipromise, I once successful, will comprehensive scheduling, person, money, material, actively promote the use of new technologies, new processes, new materials, new equipment, in strict accordance with the ISO9002 quality system operation.. Carry out the technical specifications, operation rules of construction, the implementation of total quality management. Meticulous organization, scientific management, to ensure the implementation of the commitments. Ensure the prescribed period.

Keywords: measure, project, technology, promise 

 