B市房管局办公大厦建筑给水排水设计.rar

资料分类:土木工程 上传会员:勤劳小蜜蜂 更新时间:2013-12-30
需要金币1000 个金币 资料包括:完整论文 下载论文
转换比率:金额 X 10=金币数量, 例100元=1000金币 论文字数:22826
折扣与优惠:团购最低可5折优惠 - 了解详情 论文格式:Word格式(*.doc)

摘要:本工程为淮安市房管局办公楼建筑给水排水工程设计,其中一层是物业,一层是商业,其余均为办公室及客房,是一综合性民用建筑。楼层共十三层,各层功能见建筑图所示。钢砼框架结构(一、二级耐火等级),室内外高差为1.0米。

   给水系统:采用加压供水的方式,分为上下三个区:故一层至二层的裙房部分生活给水由市政给水管道直接供水,为市政直供区;三到八层为加压低区;九到十三层为加压高区。

   热水系统:采用太阳能热水器供应热水。

   消防系统:主要采用室内消火栓系统,火灾初期10min消防用水量由屋顶消防水箱供给,消防水箱的水源由生活水泵从生活水池抽取;10min后的消防启动消防水泵,从消防水池抽水供消火栓使用。

   排水系统:采用污、废水分流制,坐便器出水直接排入市政污水管网。排水系统采用螺旋消能排水管材,就近排入市政污水管网。雨水系统主要是屋面的雨水排除,宜按重力流设计。

关键词 高层建筑;给水;消防;排水;热水

 

Abstract:A thirteen-storey general office building will be built in DRUM TOWER District, HuaianCity. The design mainly contains living water supply,fire water supply and sprinkler systems water supply. 

   Water supply system:using regional water supply, 1 to 2 for low, the net direct from the municipal water supply; 3 to 8 for low, from pumps from underground storage pond pressurized water supply, 9 to 13 for the high pressure zone ,and based Frequency Control Devices. 

   Hot water system:supply hot water using solar water heater. 

   Fire hydrant system:is mainly used indoors, 10 min fire early fire from the roof water supply tank fire, water tanks of water from fire pumps life taken from the pond life; 10 min after the fire started fire pumps, pumping water from a fire hydrant available for use. 

   Drainage system:with sewage, waste water diversion system, the toilet water directly into the municipal sewage pipeline network.Consumers using the drainage system can spiral drainage pipe, the nearest municipal sewage discharged into the pipe network. Roof rainwater system is mainly rain ruled out, should be by gravity flow design.

Key words  high-rise building  water supply  fire  drainage  hot water

 

相关论文资料:
最新评论
上传会员 勤劳小蜜蜂 对本文的描述:本工程为淮安市房管局办公楼建筑给水排水工程设计,其中一层是物业,一层是商业,其余均为办公室及客房,是一综合性民用建筑。楼层共十三层,各层功能见建筑图所示。钢砼框架......
发表评论 (我们特别支持正能量传递,您的参与就是我们最好的动力)
注册会员后发表精彩评论奖励积分,积分可以换金币,用于下载需要金币的原创资料。
您的昵称: 验证码: