XX学院宿舍楼II标段工程投标文件.rar

资料分类:土木工程 上传会员:雨橙 更新时间:2014-01-06
需要金币1000 个金币 资料包括:完整论文 下载论文
转换比率:金额 X 10=金币数量, 例100元=1000金币 论文字数:8046
折扣与优惠:团购最低可5折优惠 - 了解详情 论文格式:Word格式(*.doc)

摘要:本工程为XX学院宿舍楼II标段工程,所在地为重庆市沙坪坝区虎溪镇大学城。该工程的建设单位为XX学院,工程由大地建筑事务所设计,施工图纸齐全。基础结构采用人工挖孔桩基础。本工程为框架结构,结构安全等级为二级,抗震设防烈度为六度,建筑场地类别为III类,框架抗震等级为四级。

  我国在建设工程领域实行建设工程项目招投标制度。2008年7月15国家标准《建设工程工程量清单计价规范》(GB50500-2008)的颁布,标志着我国计价模式转向由企业自主报价的计价模式。基于以上背景,本次根据XX学院宿舍楼II标段工程项目的设计图纸,编制商务标。本商务标从企业自身水平出发,结合实际工程情况,并参考甲方提供的工程量清单及地质勘查报告,提供以工程量清单计价形式表现的投标报价。

  由于本工程工期紧临近开学,为使新一批学生能按时入住,我方承诺,在建筑过程中将应用新技术、新工艺、新材料、新设备,严格按照ISO9002质量体系运行,力保在规定工期范围内完成本工程。

关键词:工程概况 工程量清单 投标文件 保证工期

 

ABSTRACT:This works for the Chongqing City Management College dormitory II tenders tender documents, Shapingba area of Chongqing is located in Tiger Town, University City. The project construction units for the Chongqing City Management College, engineering, architectural design by the architectural firm earth, the design, construction drawings complete. Infrastructure, the use of hand-dug pile foundation. The upper part of the main for the brick, local framework structure, the structural safety of grade III, for the six seismic fortification intensity, type of construction work for the four categories.

   Implemented in the field of construction engineering construction project bidding system. July 2008 15 Country standard "construction project BOQ pricing norms" (GB50500-2008) is issued, marking China's pricing model to offer by enterprises pricing models. Based on the above background, this according to Chongqing City Management College dormitory Lot II project design drawings, preparation of business standard. The Business Standard from their own level, combined with the actual project situation and the reference provided by the Party BOQ and geological exploration report, provide the Bill of Quantities form of the tender offer.

    Due to the volume of construction works bear a larger group of students for the new University City early arrival, we promise, in the building during the application of new technologies, new processes, new materials, new equipment, in strict accordance with the ISO9002 quality system, to secure completed within the stipulated period of the project.

Keywords: Project Overview;BOQ;Tender documents;Guarantee period

 

相关论文资料:
最新评论
上传会员 雨橙 对本文的描述:本次根据XX学院宿舍楼II标段工程项目的设计图纸,编制商务标。本商务标从企业自身水平出发,结合实际工程情况,并参考甲方提供的工程量清单及地质勘查报告,提供以工程量清单计......
发表评论 (我们特别支持正能量传递,您的参与就是我们最好的动力)
注册会员后发表精彩评论奖励积分,积分可以换金币,用于下载需要金币的原创资料。
您的昵称: 验证码: