需要金币:1000 个金币 | 资料包括:完整论文 | ||
转换比率:金额 X 10=金币数量, 例100元=1000金币 | 论文字数:21989 | ||
折扣与优惠:团购最低可5折优惠 - 了解详情 | 论文格式:Word格式(*.doc) |
摘要:本设计是编制重庆巴南某办公楼室内装饰工程Ⅱ标段投标文件,具体目标是根据《GB50500-2008建设工程工程量清单计价规范》计算工程量,编制工程量清单,并根据《重庆装饰计价定额》2008和《重庆市建设工程安全文明施工措施费用计取及使用管理规定》“渝建发[2006]177 号”进行适当的投标报价。 本文工程量计算书采用工程量清单计价规则。本工程总工程造价为5411667.33元,总工期为100天,总建筑面积约为10405.2平方米,单位造价为520.09元/平方米。投标报价考虑了具体实际的相关技术措施和指标,部分考虑实际能力。清单报价采用的是自主报价的原则,所以在计算总的造价的时候,不用再单独去调整价差。 在此次毕业设计编制中,对于清单计价有了一个更深入的了解,清单计价更能体现一个公司本身的技术水平以及管理模式的优劣。对于装饰类的图纸,也有了一定了解,装饰的图纸主要的就是天地墙,分类少,但是细部的东西很多,下次再看到装饰类的图纸,不会再像这次一样,无从下手了。 关键词:投标 工程量 清单 定额
ABSTRACT:This design is the preparation of an office building in Chongqing Banan interior decoration works tender documents Ⅱ tenders. The specific objectives are based on "GB50500-2008 construction BOQ pricing norms" calculate quantities, draw up a List of engineering, and in accordance with the "Chongqing decoration denominated fixed" 2008 and "Chongqing construction safety measures civilized construction cost accrual and use regulations," "Yu Jian Fa [2006] No. 177" tender offer appropriate This book uses engineering calculation rules of the Bill of Quantities. The total project construction cost of $ 5,411,667.33 yuan, with a total duration of 100 days, A total gross floor area of approximately 10,405.2 square meters, the unit cost of 520.09 yuan / square meter. Tender offer consideration the specific conditions related to technical measures and indicators, some consider the actual capacity. List quotation uses the principle of self-quotations, so when calculating the total cost of the time, do not go alone to adjust spreads. In this graduation project preparation, for inventory valuation have a better understanding, inventory valuation better reflects a company's own technical level and management advantages and disadvantages. For decorative drawings, but also have a certain understanding, is decorated with drawings main ceiling, floors, walls, Classification small, but a lot of things in detail, the next to see decorative drawings, will not like this as, no start up. Keywords: tender;quantities;inventory;fixed
|