XX中学教学楼B标段工程.rar

资料分类:工程技术 上传会员:单旅寂人 更新时间:2014-02-10
需要金币1000 个金币 资料包括:完整论文 下载论文
转换比率:金额 X 10=金币数量, 例100元=1000金币 论文字数:49467
折扣与优惠:团购最低可5折优惠 - 了解详情 论文格式:Word格式(*.doc)

摘要:本工程为重庆市大学城第八中学教学楼B标段工程,所在地为重庆沙坪坝区虎溪镇大学城。该工程的建设单位为重庆科技学院,工程由重庆大学建筑设计研究院设计,施工图纸齐全。基础结构采用人工挖孔桩基础。上部主体框架结构,结构安全等级为二级,抗震设防烈度为六度,工程类别为一类。

 

   该投标文件的编制是以重庆市大学城第八中学教学楼B标段工程的施工合同以及施工设计图纸,国家和地方现行的一系列施工和技术规范、标准等为依据,该施工组织针对本工程的地方性及环境特点、工期要求,提出合理可行的保证措施加以重点阐述。坚持科学的基本建设程序和施工顺序,运用网络技术分段、分层流水作业,合理安排施工顺序和施工计划,确保施工进度,本工程拟定工期为213 个日历天。

   由于工期紧工程量较大,为使新一批学生及早入住大学城,我方一旦中标,全面调度公司的人、财、物,积极推广应用新技术、新工艺、新材料、新设备,严格按照ISO9002质量体系运行。贯彻施工技术规范、操作规程,实施全面质量管理。精心组织、科学管理,确保实现各项承诺目标。

关键词:工程概况  编制依据  中标

 

ABSTRACT:This works for the city of Chongqing University of Lot B eighth middle school project, the location of Tiger Town, Shapingba District of Chongqing University City. The project construction unit of Chongqing Institute of Technology, Engineering, Chongqing University Institute of Architectural Design from the design, construction drawings are complete. Infrastructure uses a hand-dug pile foundation. Upper body frame structure, structural safety rating of two, six degrees of earthquake intensity, engineering class as a class.The tender documents are compiled based on Chongqing University City eighth middle school Lot B works contracts and construction design drawings, a series of existing national and local construction and technical specifications and standards as the basis for the organization of the construction local and environmental characteristics of the project, schedule requirements, propose reasonable and feasible measures to ensure that focuses on. Adhere to the scientific procedures and infrastructure construction sequence, the use of network technology segments, layered assembly line, reasonable arrangements for the construction sequence and construction plans to ensure the construction schedule, the project intended duration is 213 calendar days.Since a large amount of tight schedule works for the new batch of students early check-University City, we once successful, comprehensive scheduling the company, financial, material, and actively promote the use of new technologies, new processes, new materials, new equipment, strict accordance with the ISO9002 quality system. Implement the construction specifications, procedures, implementation of total quality management. Meticulous organization, and scientific management to ensure the achievement of the performance targets.

Keywords: Project Name;Project Overview;Technical quality requirements

 

相关论文资料:
最新评论
上传会员 单旅寂人 对本文的描述:中学教学楼B标段工程的施工合同以及施工设计图纸,国家和地方现行的一系列施工和技术规范、标准等为依据,该施工组织针对本工程的地方性及环境特点、工期要求,提出合理可行的......
发表评论 (我们特别支持正能量传递,您的参与就是我们最好的动力)
注册会员后发表精彩评论奖励积分,积分可以换金币,用于下载需要金币的原创资料。
您的昵称: 验证码: