摘要:本毕业设计为重庆科技学院经济适用房C5栋工程投标文件编制。该工程为5层公共建筑,所在地为重庆沙坪坝区虎溪镇大学城,总建筑面积14087.69平方米。结构类型为框架结构,耐火等级为二级,抗震设防烈度为六度,使用年限50年。本投标文件编制范围为主体工程建筑、结构,不含给排水、电气、环境及室内二次精装修设计。 本毕业设计的主要依据和资料包括国家及地方现行设计规范、规程:《重庆市建筑工程计价定额计算规则(2008)(R9.7.1.1254)》;《重庆科技学院经济适用房C5栋工程设计图纸》;《混凝土结构施工图平面整体表示方法制图规则和构造详图》;《重庆2013年第4期建设工程造价信息》等。 此次设计首先是手工计算了首层的土建部分工程量和首层的钢筋工程量,然后运用广联达钢筋抽样软件计算全部工程的钢筋工程量,再用广联达图形算量软件计算全部楼层土建工程量,最后编制投标文件,完成整个毕业设计。 经过这次毕业设计,现在我对于应该如何做预算,也就是做一个完整预算的步骤,已经有了比较完整的了解了。掌握了一些没遇见过的、不懂的具体环节,而且也巩固了我曾学习到的理论知识。 关键词:投标 编制依据 工程量
ABSTRACT:The project is affordable housing in Chongqing institute of technology, building C5. The public building has five floors. Address is Shapingba district of Chongqing Huxi university town. Building area is 14087.69 square meters. Structure is a frame structure, fire resistance rating is secondary, the seismic fortification intensity is 6 degrees, use fixed number of year is 50 years. According to the design contract, the scope of construction drawing design is the principal part of the project construction, structure, not including water supply and drainage, electrical, environmental and interior fine decoration design.. The main basis of the engineering design and the materials with national and local current design specifications, procedures: 《Chongqing construction engineering valuation quota calculation rules (2008) (R9.7.1.1254)》;《 Chongqing institute of technology economy applicable room in C5 building engineering design drawings》; 《The concrete construction drawing plane whole representation and constructional detail mapping rules》; 《The chongqing 2013 no.4 construction engineering cost information》, etc. This design manual is first calculated the civil part of the first layer of quantities of quantities and the first layer of steel, and then use GuangLian da steel sampling software calculate reinforced quantities of all engineering, reoccupy GuangLian of graphics software calculating all floor construction quantities, and finally by the tender documents, complete the graduation design. Through this graduation design, budget, how should I do now is to do a complete budget step, already has a more complete understanding. Have some have never met, don't know the specific link, but also consolidate theoretical knowledge I have learned. Keywords: Bidding; Code and Standard; Quantity.
|