需要金币:1000 个金币 | 资料包括:完整论文 | ||
转换比率:金额 X 10=金币数量, 例100元=1000金币 | 论文字数:42896 | ||
折扣与优惠:团购最低可5折优惠 - 了解详情 | 论文格式:Word格式(*.doc) |
摘要:本文详细介绍了某市金燕路,滨江大道幕燕西延段等七条道路的施工建设对环境的影响,对环境现状进行调查与评价,对环境可能造成的影响进行分析,预测和评价,对环境影响的经济损益进行分析,并作出公众意见调查,最后得出环境影响评价的结论。 本项目是某市某区基础建设的重要组成部分,对加速某市道路网畅通,发展沿线地区优势产业,保护生态环境,缓解交通紧张局面,促进某市经济快速发展具有重要意义。 道路建设在施工期和运营期将不可避免地对沿线两侧一定范围的声环境、环境空气、水环境、社会环境、生态环境等产生一定的负面影响。为此,本环评对不利影响提出了减免措施。 总之,本工程不涉及自然保护区、风景名胜区、世界遗产、基本农田保护区、水源保护区、文物保护单位等敏感区,在采取相应的环境保护措施后,不利的环境影响可以减小到较小程度。因此,只要业主和承包商能够在施工和运营过程中认真落实本报告所提出的各项环境保护措施,该道路项目对环境所产生的负面影响是可以得到控制的,从环境保护的角度,本项目的建设可行。 关键词:影响预测,环境分析,生态保护
Abstract:This paper describes the city Jinyan Road, Riverside Avenue, the seven screen Yanxi extension of the road segment construction of the environmental impact of construction on the state of the environment to investigate and evaluate the possible impact on the environment analysis, prediction and evaluation, environmental impact analysis of the economic loss, and a public opinion survey, the final environmental impact assessment of the conclusions drawn. This project is a city of Shimonoseki area an important part of the infrastructure, a city road network to accelerate the flow, the development of industrial areas along the edge, protecting the environment, ease traffic tension, to promote rapid economic development in a city of great significance. Road construction during the construction period and operation period will inevitably have a certain range along the sides of the acoustic environment, ambient air, water, environment, social environment, ecological environment and so have some negative impact. To this end, the adverse effects of the environmental assessment on the proposed relief measures. In short, this project does not involve nature reserves, scenic spots, world heritage, basic farmland protection areas, water source protection areas, cultural relics protection units and other sensitive areas, in taking appropriate environmental protection measures, the adverse environmental impacts can be reduced to a more small degree. Therefore, as long as the owners and contractors to the construction and operation of the process presented in this report seriously implement the environmental protection measures, the road project on the environment arising from the negative effects can be controlled, from the perspective of environmental protection, the construction of the project is feasible. Key words: Impact prediction, Environmental analysis, Ecological protection
|