XX住宅小区A栋2标段施工工程设计.rar

资料分类:工程技术 上传会员:单旅寂人 更新时间:2014-02-02
需要金币1000 个金币 资料包括:完整论文 下载论文
转换比率:金额 X 10=金币数量, 例100元=1000金币 论文字数:80415
折扣与优惠:团购最低可5折优惠 - 了解详情 论文格式:Word格式(*.doc)

摘要:编制施工组织设计是对拟建工程施工的全过程实行科学管理的重要手段,通过施工组织设计的编制,可以全面考虑拟建工程的各种具体施工条件,扬长避短地拟定合理的施工方案,确定施工顺序、施工方法、劳动组织和技术经济的组织措施,合理地统筹安排拟定施工进度计划,保证拟建工程按期投产或交付使用,也为拟建工程的设计方案在经济上编制基本建设计划和施工企业编制施工计划提供依据。施工企业可以提前掌握人力、材料和机具使用上的先后顺序,全面安排资源的供应与消耗;可以合理地确定临时设施的数量、规模和用途;以及临时设施、材料和机具在施工场地上的布置方案。

   驰华狮王华府住宅小区A标2标段是由重庆大学建筑设计研究院设计。总计划工期216天,总建筑面积为 6372㎡ ,建筑高度为27.75m,建筑层数为6F。

   本施工组织设计严格按照工程招标范围和施工图的相关要求进行编制,在人员管理、设备配置、材料供应、质量要求、进度、安全、成本控制等方面统一部署的原则下编制。

关键字:科学管理 合理 方案 施工组织设计

 

ABSTRACT:Preparation of construction design of the proposed construction of the whole process of implementation of scientific management means the preparation of construction design, take full account of the specific construction conditions of the proposed works, exceed and develop reasonable construction program, to determine the constructionorder, method of construction, labor organizations and the organization of technical and economic measures, a reasonable overall arrangement to develop the construction schedule to ensure that the proposed project on schedule production or delivery of preparation of the planning and construction of infrastructure, but also for the design of the proposed project economicallyprovide the basis for enterprise preparation of construction plans. Construction enterprises can grasp in advance the sequence of the human, material and equipment use, comprehensive arrangements for the supply and consumption of resources; can reasonably determine the number, size and use of temporary facilities; as well as temporary facilities, materials and equipment on the construction site layout programs.

     CHI HUA Lion Washington Residential Lot A standard 2 by Chongqing University Architectural Design Institute. The total planned duration of 216 days, with a total construction area of 6372 square meters, building height of 27.75m, building layers of 6F.

    The organizational design of the construction in strict accordance with the relevant requirements of the project scope of the tender and construction drawings prepared under the unified arrangements of the principles of personnel management, device configuration, material supply, quality requirements, schedule, safety, cost control.

Keywords: scientific management,;reasonable;program;construction organization design

 