富力城二期3D组团地块16号楼工程施工组织设计.rar

资料分类:工程技术 上传会员:单旅寂人 更新时间:2014-02-02
需要金币500 个金币 资料包括:完整论文 下载论文
转换比率:金额 X 10=金币数量, 例100元=1000金币 论文字数:44117
折扣与优惠:团购最低可5折优惠 - 了解详情 论文格式:Word格式(*.doc)

摘要:本《施工组织设计》作为技术性文件,对工程的施工工期、质量目标、安全文明施工目标、项目管理架构设置与劳动力组织、施工进度计划控制及本工程拟配置的机械设备、试验检验仪器设备及周转材料配备等,以及对主要分部分项工程施工技术措施、安全文明施工及降低成本、推广新技术等诸多因素尽可能做了充分考虑,突出其科学性、适用性及针对性。

   本施工组织设计是为重庆市沙坪坝区富力城3D组团16#楼投标需要编制的。编制的指导思想是:投标时为业主着想,施工时对业主负责,竣工时让业主满意,同时在经济上合理,技术上可靠的前提下,保质、保量、保工期。

  本工程为重庆市沙坪坝区富力城3D组团16#楼住宅楼,重庆市沙坪坝区大学城,设计单位为重庆建筑设计研究院,监理单位为重庆市工程建设监理公司,承建方为中建二局西南分公司。本工程属为钢筋混凝土剪力墙结构,建筑耐火等级为二级,建筑结构使用年限为50年,抗震设防烈度为6度。现场基本具备“三通一平”条件。

关键词:施工组织设计  工程概况

 

ABSTRACT:"Construction organization design" as a technical document, the project construction period, quality, safety civilized construction goals, setting the project management structure and labor organization, construction schedule control and the project intends to configuration of mechanical test equipment, test instrument equipment and turnover materials, etc., as well as to the main division of the sectional works construction technical measures, the safety civilized construction and reduce the cost, the promotion of new technology, and many other factors made full consideration as far as possible, highlighting its scientific nature, adaptability and pertinence.

   This construction organization design is for chongqing shapingba district fuli city 3 d group 16 # building bid need to prepare. Formulated guiding ideology is: when bidding for the sake of the owner, the construction of the owner is responsible for, when it is completed let owner satisfaction, at the same time economically reasonable and technically reliable, under the premise of quality, quality, time limit for a project.

   This project for chongqing shapingba district fuli city 3 d group 16 # floor apartment, shapingba district, chongqing university, design units for chongqing architecture design and research institute, supervision company for engineering construction supervision company in chongqing, by in order to build two bureau southwest branch. This project is for reinforced concrete shear wall structure of year for 50 years, seismic fortification intensity is 6 degrees. The basic qualifications "leveling".

Key words: construction organization;design project summary

 